17
17
Operation
To Raise the Clothesline (Fig.16)
A.
Loosely grip the Spreader Bar Handle.
B.
Pull the frame away from the wall slowly
and raise above your head until you hear
both struts
‘click’ once to indicate they
have engaged.
C.
Now lower the frame slightly.
Note:
If both struts have fully engaged,
the frame will be supported squarely.
D.
If the struts did not engage on both sides
repeat steps B. and C.
To Lower the Clothesline (Fig.17)
A.
Loosely grip the Spreader Bar Handle.
B.
Raise the frame until you hear both
struts ‘click’ once to indicate they have
disengaged.
C.
Now lower the frame gently to its folded
down position.
B
C
Fig. 16
Fig. 17
A
B
A
C