SAFETY   CONSIDERATIONS  

The   unit   should   only   be   operated   by   a   competent   person   who   is   completely  
familiar   with   the   operation   and   specification   of   the   load   bank. 

 

The   equipment   is   designed   for   AC   operation   @   50Hz   only   and   therefore    must   not  
be   used   on   DC   loads   such   as   batteries. 

 

Operators   must   ensure   that   interconnecting   cables   are   correctly   rated   to   carry   the  
required   load   current   and   adequately   insulated   to   prevent   the   possibility   of   electric  
shock. 

 

When   in   use   the   load   bank   should   be   cordoned   off   using   safety   barriers. 

 

The   load   bank   should   only   be   operated   in   an   area   with   adequate   ventilation. 

 

Care   should   be   taken   as   the   exhaust   air   outlet   will   be   hot. 

 

Cables   must   be   positioned   away   from   the   air   exhaust 

 

During   operation   the   load   bank   should   not   be   covered   or   positioned   to   restrict   air  
flow 

 

Caution   –   some   metal   surfaces   will   be   hot   during   operation 

 

At   the   end   of   any   test   the   fan   should   be   kept   running   for   10   minutes   without   load  
to   remove   the   residual   heat   from   the   load   bank   case. 

 

 
CONNECTION   PROCEDURE  

 

● Ensure   the   power   source   to   be   tested   is   compatible   with   the   load   bank  

operating   voltage   and   frequency.  

● Ensure   the   power   source   is   de-energised.  

● Do   not   attempt   to   operate   the   load   bank   above   the   maximum   operating  

voltage   or   frequency  

● Check   all   panel   mounted   control   switches   are   in   the     OFF     position.  

● Connect   the   hand   held   controller   to   the   load   bank  

● Ensure   the   neutral   and   earth   are   connected   correctly   to   the   power   source  

● Ensure   the   neutral   and   earth   are   connected   correctly  

 

● Ensure   the   power   cables   are   correctly   connected   to   the   power   source   

● Connect   powerline   connectors   to   the   load   bank  

 

 

4  

 

Summary of Contents for HAC240

Page 1: ...OPERATING MANUAL for AC LOAD BANK type HAC240 415 100 iHHC3 hand held controller single three phase operation 50 Hz issue 3 ...

Page 2: ...NCE PROCEDURES 11 FAULT FINDING PROCEDURES 11 FAN COOLING NOT OPERATIONAL 11 LOAD BANK DOES NOT PROVIDE SUFFICIENT LOAD CURRENT 11 The information contained in this document is considered correct at the time of printing and given in good faith Hillstone Products bears no responsibility for the accuracy of the data given or any responsibility resulting from the use of the equipment Unit 1 2 Freetow...

Page 3: ...es The unit comprises of pre set force cooled high powered resistor channels which allows manual adjustment of the load current via a hand held controller Safety features include internal fuse protection fan motor overload protection auxiliary circuit protection auto shutoff in the event of a mains interruption The load bank is force cooled by a single phase powered fan which is connected to the l...

Page 4: ...the air exhaust During operation the load bank should not be covered or positioned to restrict air flow Caution some metal surfaces will be hot during operation At the end of any test the fan should be kept running for 10 minutes without load to remove the residual heat from the load bank case CONNECTION PROCEDURE Ensure the power source to be tested is compatible with the load bank operating volt...

Page 5: ...OMHAC415 100 CONNECTION DIAGRAM FOR 3PHASE TEST 5 ...

Page 6: ...OMHAC415 100 SINGLE PHASE CONNECTION up to 33kW 6 ...

Page 7: ...OMHAC415 100 SINGLE PHASE CONNECTION up to 100kW 7 ...

Page 8: ...ower source from the UPS or generator 4 Switch on the green panel mounted rocker switch 5 Ensure the fan rotates in the correct direction with exhaust air being expelled from the exhaust grill 6 Do not exceed the maximum rating of the load bank 7 At the end of a test the mains control rocker switch should be left on for a few minutes until the resistors have cooled 8 Ensure the power source is iso...

Page 9: ...he black buttons to increase and decrease the load in 1kW steps for each button press 5 New load profiles can be set by pressing the X1 X10 or X100 push buttons and accepting or reverting yellow button back to the existing load 6 The load can be disconnected from the power source in two ways a SLOW STOP orange push button this feature removes the total load in sequence in a few seconds b QUICK STO...

Page 10: ...kgs approx Movement 5 swivel castors Load Bank Environmental Designed for outdoor operation Electrical control chamber IP54 Element chamber IP21 TYPICAL PERFORMANCE TABLE RATING TABLE Internal Channels 415VAC 240VAC L1 L2 L3 Linked 240VAC L1 only Channel Watts Channel Current Channel Watts Channel Current Channel Watts Channel Current 1 1 000 W 1 4 A 1 000 W 4 17 A 333 W 1 4 A 2 1 000 W 1 4 A 1 00...

Page 11: ...ible problem areas as follows FAN COOLING NOT OPERATIONAL Check the power source is available Check the phase rotation is correct Check the interconnecting cable connections Check the fan motor operates Check for air blockage Check fan blades are secured to the motor shaft LOAD BANK DOES NOT PROVIDE SUFFICIENT LOAD CURRENT Check the power source is at the required voltage Do not exceed the maximum...