12.
When the work is finished, remove the kit and place it in the storage compartment.
6
8
9
7
6
8
8
10
11
9
OVERFLOW DEVICE
The machine is NOT equipped with an overflow device, because the volume of the recovery tank is greater than the capacity of the solution tank. In extraordinary cases, there is a mechanical device (float) under
the recovery tank lid that, when the recovery tank is full, shuts off the air to the vacuum motor intake to protect it; the sound of the suction motor will then be deeper. Empty the recovery tank (see “
”).
AT THE END OF THE WORK
At the end of the work, and before carrying out any type of maintenance, perform the following operations:
1. Lift the brush head body and press the “BRUSH HEAD CONTROL” button (1) on the control panel (
Fig.1
).
N.B.
:
as soon as the button (1) on the control panel is pressed, the green LED (2) (“BRUSH HEAD BODY WORK POSITION”) will switch off (
Fig.1
).
2. Lift the squeegee body and press the “SQUEEGEE CONTROL” button (3) on the control panel (
Fig.1
).
NB
:
as soon as the button (3) on the control panel is pressed, the green LED (4) (“SQUEEGEE BODY WORK POSITION”) will switch off (
Fig.1
).
3. Press the drive pedal (5) (
Fig.2
) to begin moving the machine.
4. Take the appliance to the dedicated dirty water drainage area.
5.
Switch off the machine by turning the key (6) of the main switch a quarter turn anti-clockwise (
Fig.3
). Remove the key from the instrument panel.
6. Carry out all the procedures listed in the paragraph “
RECOMMENDED PERIODIC MAINTENANCE
” indicated in the column “AT THE END OF THE WORK”.
7. Sit on the driver’s seat.
8. Insert the key (6) into the main switch on the control panel. Set the main switch to "I" (
Fig.4
).
9. Press the drive pedal (5) (
Fig.2
) to begin moving the machine.
10. Take the appliance to the designated machine storage place.
ATTENTION:
Park the machine in an enclosed place, on a flat surface, and at a safe distance from any objects that could either damage it or be damaged due to contact with the machine itself.
11. Secure the machine, see the section titled “
3
4
6
6
2
5
1
4
2
3
1
RECOMMENDED MAINTENANCE OPERATIONS
TYPE OF MAINTENANCE
AT THE END OF THE WORK
DAIL
Y
WEEKL
Y
BEFORE A
LONG
PERIOD OF NON- USE
TRANSPORT
DRAINING THE RECOVERY TANK
X
X
X
CLEANING THE SQUEEGEE BODY
X
X
X
CLEANING BRUSH HEAD BRUSHES (SCRUBBING)
X
X
CLEANING THE RECOVERY TANK FILTERS
X
X
CLEANING THE RECOVERY TANK
X
X
EMPTYING THE SOLUTION TANK
X
X
X
CLEANING THE WATER SYSTEM FILTER
X
X
CLEANING THE VACUUM TUBE
X
X
DRAINING THE RECOVERY TANK
Proceed as follows to empty the recovery tank:
1. Take the machine to the maintenance area.
2. Make sure the machine has been secured (see the section titled “
CAUTION
:
users are advised to always wear protective gloves, to avoid the risk of serious injury to hands.
3. Remove the drainage hose of the recovery tank from the clamps; it is located at the rear of the machine (
Fig.1
).
4. Bend the end of the drainage tube in order to create a choke and prevent the content from coming out (
Fig.2
), then position the tube on the discharge surface, unscrew the
cap, and gradually release the tube.
N.B.
: the place designated for this operation must comply with current environmental protection regulations.
5. Repeat the operations in reverse order to reassemble all the parts.
2
1
20
Summary of Contents for TRIDENT R26SC PRO
Page 2: ......
Page 3: ...ENGLISH 4 ESPA OLA 30 FRAN AIS 56 3 ESPA OLA FRAN AIS ENGLISH...
Page 82: ...ESPA OLA FRAN AIS ENGLISH 82...
Page 83: ......