Installing gateway
35/98
SmartWire-DT Gateway | EU5C-SWD-ETHERCAT
DOC140901UM01EN | Revision 1 | English | 2015-03 | Released | Public
© Hilscher 2015
Keep on pushing the gateway
downwards and tilt it back into
vertical position, thereby hooking
the gateway into the lower railing.
Figure 8: Hook gateway to lower
railing
Let go of the gateway. The spring
inside the bolt automatically pushes
the gateway upwards into the
railings, thereby fixing the gateway
to the top hat rail.
Figure 9: Gateway is clamped to top
hat rail