background image

Installation Instructions

Family: Atlantis | Item No. 55602 

Start Here

HINKLEY   

33000 Pin Oak Parkway 

Avon Lake, OH 44012 

(p)800.442.5539 / (f) 440.653.5555 

 www.hinkley.com

Top Cover

Glass

Quick Connect

Ground wire

Condui

Conduitt

 connection

Bollard Mount

PVC

Set Screw

 

Concrete 

(optional)

2 1/2" 

Min Hight

 

4 1/2" 

Max 

Threaded Tube

Note: Threaded 

tube can be 

adjusted to 

change hight of 

fixture 

Bottom Plate

Wiring Coupler

Bottom Cover

E

xternal tooth 

washer (lock)

 

PVC

Please do not 

cut the top of 

the PVC pipe  

UBM to rest on top of 

Pipe. 

 

E

xternal tooth 

washer (lock)

 

Nut

Unpacking

1. Unpack the bollard and the glass from the box.

2. Remove the bollard mount, threaded tube assembly, and PVC pipe from the box.

Luminaire Mounting

Note: If your local code requires a frost line burial deeper than 12 inches, you may 

purchase a 2 inch PVC pipe (sch. 40 or sch. 80) from a local supplier and cut to 

length as a replacement to the provided PVC pipe.

1.

Dig a hole about 12 inches or deeper, depending on your

local code.

2.

Feed the wires through the PVC pipe and insert it in the

ground, make sure the PVC is sticking out of the ground

enough that the bollard mount will fit on top of the PVC, and

that the bottom of the bollard mount is level with the ground.

3.

Fill in the hole around the PVC pipe.

4.

Level the PVC pipe with a post level.

5.

Feed the wires through the bollard mount and the threaded

tube assembly, pull the wires out through the wiring coupler.

6.

Put the bollard mount on top of the PVC pipe.

7.

Tighten the three set screws on the sides of the bollard

mount.

Assembly

1.

Wire the fixture wires and the main wires together using wire

 

nuts. Put the silicone glue, that’s provided, in the wirenuts to

 

waterproof. All connections must be housed with in the lower

 

section of the bollard and above ground.

2.

Remove the bottom cover.

3.

For ground installation: screw the nut

s

 (supplied) onto the

 

threaded tube to get the correct height adjustment. This step

 

is 

not needed for concrete or other hard surface installations.

4.

Put the main body of the fixture over the bollard mount and

 

threaded tube assembly.

5.

Rotate the fixture to the desired position.

6.

Put a nut 

and two external tooth washers 

(supplied in the 

parts bag) on top of the threaded

 

tube and tighten.

7.

Replace the bottom cover.

8.

Unscrew the four screws from the top cover and remove the

 

cover.

9.

Insert the glass into the fixture, and screw it in

.

10.

I

nsert the LED into the top cover, screw in the set screw

 

to secure to the top

 and

 

connect the wires with the quick

 

connect.

11.

Put the top cover back on and tighten the four screws

Reviews: