2.1 Pre-Operation Inspection
16
Operation Check
If the operation check reveals any abnormalities,
stop the check immediately and do not use the
instrument.
Required equipment:
• Model 3804-50 (this instrument)
• Model 3851-10 TEST LEAD
• AC power receptacle
(100 V AC 50 Hz/60Hz commercial power supply)
1.
Set the function switch to "
Ω
".
2.
Press the
SHIFT
key to conduct the continuity
check. (
lights.)
To avoid electrocution, do not touch the ter-
minals.
For safety reasons, when taking measurements,
only use the test lead provided with the instrument.
In order to protect the tips
of the test leads, the test
leads are capped when
the unit is shipped from
the factory. Be sure to
remove the caps before
using the test leads.
2.1 Pre-Operation Inspection
Summary of Contents for 3804-50
Page 2: ......
Page 12: ...ご使用にあたっての注意 8 ...
Page 18: ...1 2 各部の名称と機能 14 スタンドを立てたまま 上方向から強い力を加えないでくださ い スタンドを損傷します ネジ 通信ポート 背面 ...
Page 30: ...2 7 コンデンサ容量測定 26 ...
Page 42: ...3 11 通信機能 オプション 38 コネクタを本器から外す場合はツメを押しながら引き 抜きます ツメ ...
Page 54: ...5 3 確度 50 ...
Page 60: ...6 5 全点灯表示の確認方法 56 ...
Page 64: ......
Page 66: ......
Page 76: ...8 ...
Page 94: ...2 7 Capacitance Measurement 26 ...
Page 106: ...3 11 Communications Function 38 ...
Page 125: ...索引 4 3 2 1 7 6 5 10 9 8 ...
Page 126: ......
Page 129: ......