■
I/O
32
/
52
■ I/O output signals
Signal
Signal name
Contact
Output
signal
Description
OUT0
Start OUT
A
OFF→ON
ON: Operation has started
OUT1
Finish OUT
A
OFF→ON
ON: Finish operation
OUT2
FOR/REV OUT
A
Level
OFF: FOR (clockwise), ON: REV
(counterclockwise)
OUT3
Busy OUT
A
Level
OFF: Not operating, ON: Operating
OUT4
Error 1 OUT
A
OFF→ON
ON: SVD error
OUT5
Error 2 OUT
A
OFF→ON
ON: Operation error
OUT6
Error 3 OUT
A
OFF→ON
ON: SVC error
OUT7
Error 4 OUT
A
OFF→ON
ON: Operation error (only when torque judgment is
NG)
OUT8
Reserved
OUT9
Reserved
OUT10 Torque judgment OK OUT
A
OFF→ON
ON: Torque judgment is OK
OUT11
OUT12
OUT13
OUT14
OUT15
11.2 I/O input signal reception time table
■ I/O input signals
Signal
Signal name
Min. reception time (msec)
Notes
IN0
Start IN
100
Received only while shaft is stopped
IN1
FOR/REV switching IN
100
Received only while shaft is stopped
IN2
Auto/Manual switching IN
100
Received only while shaft is stopped
IN3
CH1 IN
Applied when start I/O is ON
IN4
CH2 IN
Applied when start I/O is ON
IN5
CH4 IN
Applied when start I/O is ON
IN6
CH8 IN
Applied when start I/O is ON
IN7
PTN1 IN
Applied when start I/O is ON
IN8
PTN2 IN
Applied when start I/O is ON
IN9
PTN4 IN
Applied when start I/O is ON
IN10
Temporary/Full tightening
switching IN
100
Received only while temporary tightening is
performed
Summary of Contents for DCD-40L
Page 1: ...Current Controlled Screwdriver DCD 40L 115W Instruction Manual ET A070 19A HIOS Inc ...
Page 27: ... Operation timing charts 27 52 Pattern 2 ...
Page 28: ... Operation timing charts 28 52 Pattern 3 ...
Page 29: ... Operation timing charts 29 52 Pattern 4 ...
Page 37: ... I O 37 52 Timing chart for normal operations when torque judgment is NG ...
Page 38: ... I O 38 52 Timing chart when emergency stop signal is input ...