■
I/O
35
/
52
■ Output status signals
OUT0 (Start OUT)
The status of the screw tightening operation is indicated.
The indicator lights up while the screw tightening operation is being performed.
OUT1 (Finish OUT)
The status of the screw tightening operation is indicated.
The indicator lights up for 100 ms after the screw tightening operation is complete.
OUT2 (FOR/REV OUT)
The current clockwise/counterclockwise setting is output.
OUT3 (Busy OUT)
The current operation status is output.
ON is output when shaft is in operation, and OFF is output when the shaft is stopped.
OUT4 (Error 1 OUT)
Output is performed when an SV-NET driver error occurs.
OUT5 (Error 2 OUT)
Output is performed when an operation error occurs.
OUT6 (Error 4 OUT)
Output is performed when an SV-NET controller error occurs.
OUT7 (Error 8 OUT)
Output is performed only when operation error with NG torque judgment occurs.
OUT10 (Torque judgment OK OUT)
Output is performed only when torque judgment is OK after operation is complete.
Summary of Contents for DCD-40L
Page 1: ...Current Controlled Screwdriver DCD 40L 115W Instruction Manual ET A070 19A HIOS Inc ...
Page 27: ... Operation timing charts 27 52 Pattern 2 ...
Page 28: ... Operation timing charts 28 52 Pattern 3 ...
Page 29: ... Operation timing charts 29 52 Pattern 4 ...
Page 37: ... I O 37 52 Timing chart for normal operations when torque judgment is NG ...
Page 38: ... I O 38 52 Timing chart when emergency stop signal is input ...