4
English
SPECIFICATIONS
Voltage (by areas)*
(110V, 115V, 120V, 127V, 220V, 230V, 240V)
Power Input
1340 W*
Full-load Impact Rate
1400 min
–1
Weight (without cord, side handle)
16.5 kg
* Be sure to check the nameplate on product as it is subject to change by areas.
STANDARD ACCESSORIES
(1) Case ............................................................................ 1
(2) Bull Point ................................................................... 1
(3) Hexagon Bar Wrench (for 8 mm bolt) ................ 1
(4) Hexagon Bar Wrench (for 4 mm bolt) ................ 1
Standard accessories are subject to change without
notice.
OPTIONAL ACCESSORIES (sold separately)
䡬
Asphalt Cutting
䡬
Groove Digging and Edging
䡬
Tamping
䡬
Scooping Work
䡬
Grease
500 g (in a can)
30 g (in a tube)
Optional accessories are subject to change without
notice.
APPLICATIONS
Demolishing concrete, chiseling off concrete, grooving,
bar cutting.
Application examples:
Installation of piping and wiring, sanitary facility
installation, machinery installation, water supply and
drainage work, interior jobs, harbor facilities and other
civil engineering works.
PRIOR TO OPERATION
1. Power source
Ensure that the power source to be utilized conforms
to the power requirements specified on the product
nameplate.
2. Power switch
Ensure that the power switch is in the OFF position.
If the plug is connected to a receptacle while the
power switch is in the ON position, the power tool
will start operating immediately, which could cause
a serious accident.
3. Extension cord
When the work area is removed from the power
source, use an extension cord of sufficient thickness
and rated capacity. The extension cord should be
kept as short as practicable.
(1) Cutter
Overall Length: 410 mm
Width: 75 mm
(1) Scoop
Overall Length: 410 mm
(2) Shank
Overall Length: 250 mm
(1) Cold Chisel
Overall Length: 410 mm
(1) Rammer
Outer diameter: 200 mm
PRECAUTIONS ON USING DEMOLITION
HAMMER
1. Wear earplugs to protect your ears during operation.
2. Do not touch the bit during or immediately after
operation. The bit becomes very hot during operation
and could cause serious burns.
3. Before starting to break, chip or drill into a wall,
floor or ceiling, thoroughly confirm that such items
as electric cables or conduits are not buried inside.
4. Wear a mask when turning your head upward.
5. Properly set the bit holder
6. At the start of work, confirm screw tightening.
7. When working at a highly elevated location, pay
attention to articles and persons below.
8. Wear protective shoes to protect your feet.
Summary of Contents for H 65SB2
Page 2: ...2 1 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 4 1 3 2 2 5 3 1 2 7 6 ...
Page 34: ...33 ...
Page 35: ...34 ...
Page 37: ...36 ...
Page 39: ...38 1 2 3 4 5 ...
Page 40: ...39 ...