![background image](http://html.mh-extra.com/html/hitachi/3080-g2/3080-g2_hardware-reference-manual_143246101.webp)
5.
Record the following information:
• IP addresses for Ethernet ports 0 and 1
• Gateway
• Domain name
• Host name
Shutting down the server you are replacing
On the server that you are replacing:
Procedure
1.
From the server console, issue the command:
shutdown --ship --
powerdown
Wait until the console displays
Information: Server has shut down
,
and the rear panel LEDs turn off. The PSU and server fans continue to
run until you remove the power cables from the PSU module. See the
appropriate system component section for more information.
Note:
This specific
powerdown
command prepares the system for both
shipping, and potential long-term, post-replacement storage.
2.
Unplug the power cords from the power supplies.
3.
Wait approximately 15 seconds, and then confirm the NVRAM status LED
is off.
If the LED is flashing or fixed, press and hold the
reset
button for five
seconds until the LED starts flashing. The battery disables when you
release the
reset
button.
Server replacement procedures
101
Hitachi NAS Platform 3080/3090 G2 Hardware Reference Guide
Summary of Contents for 3080 G2
Page 1: ...Hitachi NAS Platform 3080 and 3090 G2 Hardware Reference Release 12 2 MK 92HNAS017 05 ...
Page 7: ...7 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Page 19: ...About this manual 19 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Page 28: ...28 Mandatory regulations Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Page 29: ...Mandatory regulations 29 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Page 35: ...System overview 35 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Page 79: ...Replacing server components 79 Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...
Page 128: ...Hitachi NAS Platform 3080 3090 G2 Hardware Reference Guide ...