Installation
5–35
Hitachi AMS 2100/2300 Storage System Hardware Guide
Figure 5-32: Securing Rear of the Array
Connecting cables
This section provides information and instructions to connect and route
power cables, ENC cables, Fibre Channel cables and iSCSI cables.
Table 5-7: Securing Rear of the Array
Item
Description
Item
Description
Item
Description
Item
Description
Binding Screw
Stopper
Rail
Frame
CAUTION! Be careful to connect cables correctly. Leave a service
loop in each cable to facilitate maintenance and prevent it from
being stretched or pulling on the connectors, and to leave some
slack in case of an earthquake.
Use the cable routing bars that are provided with the high-density
expansion unit to route power and ENC cables to protect them from
being bent too sharply or tangled and caught when the unit is
moved within the rack.
Before connecting power cables to the array, make sure that the
circuit breakers on the PDBs (power distribution busses) are
turned OFF.
Summary of Contents for AMS 2100
Page 20: ...xx Preface Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 28: ...1 8 Introduction Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 50: ...1 30 Introduction Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 176: ...5 58 Installation Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 240: ...7 58 Configuration Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 278: ...10 6 Upgrading the firmware Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 292: ...B 6 Regulatory information Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 304: ...Index 4 Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 305: ...Hitachi AMS 2100 2300 Storage System Hardware Guide ...