7–32
Configuration
Hitachi AMS 2100/2300 Storage System Hardware Guide
•
Cautionary note about system construction
This section offers a cautionary note about the system construction before
connecting the AMS2100/AMS2300 to the host.
When using LUN Manager on a fabric switch connection
Observe the following when using LUN Manager on Fabric Switch
connection:
• When connecting to the servers (HBA) or exchanging the HBA, connect
to the servers (HBA) that can access to Disk Array after the LUN
Manager setting, including WWN registration, completes.
• Zoning on Fabric Switch must be set as shown below to redirect access
from the HBA that cannot be accessed to Disk Array by LUN Manager.
•
Option setting for improving I/O response time in small-scale
NOTE: If you encounter a problem registering your base unit, please
contact Hitachi Data Systems Global Services at:
•
United 1 866-371-7140
•
Europe / Middle East / 44 (0) 1753 216053
•
All other R1 858-621-7124
Host-A
HBA#1
HBA#2
Host-B
HBA#3
HBA#4
CTL 0
CTL 1
Port 0A
Port 0B
Port 1A
Port 1B
Fabric Switch
:
Zoning
LU0
(
HBA#1
,
HBA#2
)
LU1
(
HBA#3
)
Summary of Contents for AMS 2100
Page 20: ...xx Preface Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 28: ...1 8 Introduction Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 50: ...1 30 Introduction Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 176: ...5 58 Installation Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 240: ...7 58 Configuration Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 278: ...10 6 Upgrading the firmware Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 292: ...B 6 Regulatory information Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 304: ...Index 4 Hitachi AMS 2100 2300 Storage System Hardware Guide ...
Page 305: ...Hitachi AMS 2100 2300 Storage System Hardware Guide ...