6 MAINTENANCE
6-14
(*4) This recovery action varies depending on which software tool was in use at the occurrence of the power-off condition or reset.
The table of the following page shows the recovery actions required for each available software tool and option selection used.
No.
Tool type
Option selection
Recovery
1
Backup restore system
Required action
Retry this option.
2
Load user application
Retry this option.
3
RPDP-S10V system
svrpl (send all tasks at a time)
Retry this option.
4
ld (send one task at a time)
Send all the necessary tasks to the
destination at a time by using the svrpl
option.
5
HI-FLOW system
[Send] - [All processes]
Retry this option.
6
[Send] - [Designated process]
Send all the necessary processes to the
destination at a time.
7
[Delete process of PCs] -
[Exchange all process and
system]
Retry this option.
8
[Delete process of PCs] -
[Specify the process range]
Delete all the existing processes, send
all the necessary processes to the
destination, and then retry this option.
9
Change system edition
Delete all the existing processes, send
all the necessary processes to the
destination, and then retry this option.
10
CPMS debugger system
Initialize the task
Retry this option.
11
Loading and register of task /
Delete task
Initialize the task storage area in the
CMU module’s memory by using task
environment initialization and then
load all the necessary tasks into that
area.
12
NX/Tools-S10V system
Transfer system program
Retry this option.
13
Change DF setup
Transfer the system programs to the
destination and then retry this option.
14
PIOP system
Setup system parameters
Retry this option.
Summary of Contents for CMU LPQ520
Page 1: ......
Page 2: ......
Page 17: ...This Page Intentionally Left Blank ...
Page 19: ...This Page Intentionally Left Blank ...
Page 23: ...This Page Intentionally Left Blank ...
Page 28: ...v 6 4 Replacing the CMU Module 6 49 6 4 1 Replacing the module 6 49 6 5 Trouble Report 6 51 ...
Page 30: ...1 SPECIFICATIONS ...
Page 38: ...2 NAMES AND FUNCTIONS OF EACH PART ...
Page 43: ...This Page Intentionally Left Blank ...
Page 44: ...3 MOUNTING AND WIRING ...
Page 52: ...4 OPERATION ...
Page 85: ...This Page Intentionally Left Blank ...
Page 86: ...5 USER GUIDE ...
Page 101: ...This Page Intentionally Left Blank ...
Page 102: ...6 MAINTENANCE ...