--- 22 ---
Front Cap
[1]
Stopper Ring
[2]
Ball Holder
[4]
Holder Plate
[5]
Holder Spring
[6]
Washer (B)
[7]
Grip
[3]
Fig. 10
Steel Ball 7.0
[21]
Grip
[3]
Fig. 9
(2) Disassembly of the tool retainer
Slide the Grip
[3]
fully in the arrow direction as shown in Fig. 9 and remove the Front Cap
[1]
. Pulling the Grip
[3]
as shown in Fig. 10, remove the Stopper Ring
[2]
with a retaining ring puller. Then the Grip
[3]
, Ball Holder
[4]
, Steel Ball D7.0
[21]
, Holder Plate
[5]
, Holder Spring
[6]
and Washer (B)
[7]
can be removed from the
Cylinder
[22]
.
(3) Disassembly of the cylinder and the second gear (slip mechanism section)
Remove the Gear Cover
[10]
from the Inner Cover
[39
] and remove the entire tool retainer. Remove the
Retaining Ring for D20 Shaft
[8]
with a retaining ring puller. Stand the Gear Cover
[10]
in this state and pull
out the Cylinder
[22]
from the Gear Cover
[10]
with a hand press. Then the Sleeve
[17]
can be removed from
the Cylinder
[22]
. Remove the Retaining Ring for D30 Shaft
[26]
from the Cylinder
[22]
with a retaining ring
puller. Then the Second Gear
[23]
, Spring (A)
[24]
and Washer (A)
[25]
can be removed from the Cylinder
[22]
.
(4) Disassembly of the cylinder and the second hammer
Remove the Stopper Ring
[34]
from the inside diameter portion of the Cylinder
[22]
. Then the Second
Hammer
[27]
, O-ring (1AP-20)
[28]
, Hammer Holder
[29]
, O-ring (B)
[30]
, Damper (A)
[31]
, O-ring (C)
[32]
and Damper Holder
[33]
can be removed from the Cylinder
[22]
. Remove the Stopper Ring
[34]
from the
groove of the inside diameter portion of the Cylinder
[22]
by tapping the Stopper Ring
[34]
through the 5-mm
diameter hole of the Cylinder
[22]
with a hammer and a punch as shown in Fig. 11. At reassembly, replace the
Stopper Ring
[34]
with new one as the removed Stopper Ring
[34]
is deformed. To prevent idle hammering,
also replace O-ring (C)
[32]
with new one at reassembly.
Summary of Contents for DH24PB2
Page 39: ......