BREAK-IN
2-2
AFTER THE FIRST 50 HOURS
1. Check coolant, engine oil, and hydraulic oil level and
for leaks every day. Refill with the recommended oils
and coolant.
2. Check and grease the greasing points at the regular
intervals. Grease the front attachment pins every day.
3. Retighten bolts at the regular intervals.
4. Re-drive in the tooth (point) holding wedges.
5. Check the monitor for any abnormality while operat-
ing the machine.
6. Operate the machine after thoroughly warming up the
engine and hydraulic oil.
7. Check the machine for any abnormal operations
while operating the machine.
Summary of Contents for EX1900-5
Page 1: ......
Page 37: ...SAFETY SIGNS S 29 SS 411 SS 691 SS 442 M18C 01 006 SS 445 M144 07 107 ...
Page 38: ...SAFETY SIGNS S 30 SS 446 SS 723 SS3076117 SS 723 SS 410 SS 723 Loading Shovel ...
Page 39: ...SAFETY SIGNS S 31 SS3091476 M146 01 035 ...
Page 40: ...SAFETY SIGNS S 32 SS 413 M18C 01 007 M18C 01 008 ...
Page 42: ...SAFETY SIGNS S 34 MEMO ...
Page 112: ...DRIVING THE MACHINE 4 12 MEMO ...
Page 140: ...MAINTENANCE 7 8 MEMO ...
Page 146: ...MAINTENANCE 7 14 Hoses Q ty in Use Transmission Oil Cooler Hose 5 2 M18C 07 062 5 ...
Page 156: ...MAINTENANCE 7 24 4 Grouped Grease Fittings 7 Arm Ñ Lubrication M144 07 079 M144 07 005 7 ...
Page 258: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 274: ...TROUBLESHOOTING 11 14 MEMO ...
Page 278: ...SPECIFICATIONS 12 4 MEMO ...