--- 22 ---
10. STANDARD REPAIR TIME (UNIT) SCHEDULES
MODEL
20
40
60
80
Fixed
Variable
H 70SA
Work Flow
Mouth
Mouth Cover
Ur
ethane Ring
Shank Sleeve
Damper (A)
O-ring (B)
O-ring (E)
120 min.
100
Gear Cover
Handle (A)
Handle (B)
Handle Pin
Handle Holder
General Assembly
Front Cover
Stop Lever
Ass'y
O-ring (C)
Second
Hammer
Housing Ass'y
Stator Ass'y
Cylinder Case
Ball Bearing
(6302)
Final Gear
Crank Shaft
Ball Bearing
(6205)
Inner Cover
Armature Ass'y
Striker
Piston
Connecting
Rod Ass'y
Needle Bearing
Oil Seal (A)
O-ring (A)
O-ring
(1AS-60)
Switch (A)
Cord
Ball Bearing
(6201)
Ball Bearing
(6203)
Counter Gear
Ball Bearing
(6001)
Ball Bearing
(6201)