2-9
3 Measure TP12 of the EZJ125 board with an oscilloscope and make sure it is
within the range of DC250V ± 15V.
When confirmation is completed, press Abort and you can stop work before 3 minutes elapse.
Charge voltage
[Waveform of charge voltage confirmation]
← GND level
For the position of the
board and test pins, refer to “3.3.2 EZJ125 board.”
Summary of Contents for IJ RX2
Page 1: ...Service Manual HITACHI Printer Model RX2 Revision Feb 2014 Version A ...
Page 13: ...1 8 2 External views Rear side 1 2 2 Main body internal ...
Page 14: ...1 9 1 2 3 Print head ...
Page 101: ...3 26 Circuit diagram of EZJ127A ...
Page 102: ...3 27 Circuit diagram of EZJ127B ...
Page 116: ...3 41 Circuit diagram of EZJ129 ...
Page 164: ...4 40 5 Reset the time of the R air filter to 0 on the Parts usage time management screen ...
Page 247: ...7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram 7 1 ...
Page 249: ...7 3 7 2 2 Electrical Connection Diagram RX2 B Basic model 7 3 ...