--- 26 ---
(b) Reassembly
Disassembly procedures should be followed in the reverse order. Note the following points.
Insert the Nail Rail
[63]
from the rear of the Magazine
[76]
and press-fit the Nail Rail
[63]
into the Magazine
[76]
by tapping with a wooden hammer so that the protrusion of the Nail Rail
[63]
becomes flush with the
rear end of the Magazine
[76]
.
Hook the hook of the Ribbon Spring
[74]
on the Magazine
[76]
then mount Nail Feeder (B)
[72]
to the
Magazine
[76]
.
Press the mounting surface of the Nail Stopper
[78]
against the Magazine
[76]
and slide it backward until
the "A" portion fits into the concave portion of the Magazine Cover
[67]
then secure them with the bolt. At
this time, mount the Sleeve
[66]
without fail.
Fig. 20
Hook
Nylon Nut M6
[65]
Sleeve
[66]
Nail Feeder (B)
[72]
Hex. Socket
Hd. Bolt (W/Flange)
M6 x 12
[77]
Pushing Lever Stopper
[71]
Nail
Stopper
[78]
Needle Roller D4 x 20
[75]
Nail Rail
[63]
Magazine Cover
[67]
Rear
Front
Nylock Bolt (W/Flange)
M6 x 20
[27]
Handle Arm
[64]
Connector
[62]
Roll Pin D4 x 40
[69]
Nail Feeder (A)
[68]
Spring
[70]
Ribbon Spring
[74]
Roll Pin D3 x 10
[73]
Magazine
[76]
Hex. Socket Hd. Bolt
(W/Flange) M6 x 12
[77]
A
Summary of Contents for NR 90AC2
Page 37: ......