English
— 18 —
(2) Continuous operation (Push lever fire)
1
Pull the trigger with the Nailer off the
workpiece.
2
Depress the push lever against the
workpiece to drive a nail.
3
Move the Nailer along the workpiece
with a bouncing motion.
Each depression of the push lever will
drive a nail.
As soon as the desired number of nails
have been driven, remove finger from the
trigger.
WARNING
䢇
Keep your finger off the trigger except
during fastening operation, because
serious injury could result if the push
lever accidentally contacts you or
others in work area.
䢇
Keep hands and body away from the
discharge area. This Hitachi nailer may
bounce from the recoil of driving a
fastener and unwanted subsequent
fastener may be driven, possibly
causing injury.
䢇
Some types of loaded nails can spark
out of the muzzle during a nail driving
operation. Exericise caution!
THE OPTIONAL SEQUENTIAL TRIP
MECHANISM (SINGLE SHOT PARTS) is for
use where precision fastener placement is
desired and must be operated in accordance
with the following “Method of Operation”.
You must first depress the push lever
(upward position) where you wnat to
drive a nail and then pull the trigger. After
the each nail is driven, completely release
the trigger and lift the tool off the work
surface.
An OPTIONAL SEQUENTIAL TRIP
MECHANISM may reduce the possibility
of bodily injury to you or others in the
work area. This is because it is less likely
to drive an unwanted nail if you keep the
trigger pulled and accidentally bump the
push lever against yourself or others. An
OPTIONAL SEQUENTIAL TRIP
MECHANISM may also reduce the speed
of operation compared to the standard
contact trip mechanism.
NOTE:
䢇
Both STANDARD CONTACT TRIP
MECHANISM and OPTIONAL
SEQUENTIAL TRIP MECHANISM are safe
if used as described above and accroding
to all warnings and instructions.
䢇
Always handle nails and package
carefully.
If nails are dropped, collating wire may
be damaged and cut, which will cause
mis-feeding and jamming.
䢇
After nailing:
1) disconnect air hose from the Nailer;
2) remove all nails from the Nailer;
3) supply 5 – 10 drops of Hitachi
pneumatic tool lubricant into the air
plug on the Nailer; and
4) open the petcock on the air
compressor tank to drain any
moisture.
Push Lever
Trigger
2
3
3
Previously pull
the trigger
1
01Eng_NV45AB2_US
2/26/09, 11:46
18