6-1
Chapter 6
Installation
6.1 Contents in this chapter
This chapter describes the items to be taken into
consideration for installation.
6.2 Installation
The product must be installed as following the instructions
provided in the Safety Function Guide and the User’s Guide
of SJ-P1 and this documentation.
In case of using any optional devices such as a fieldbus
module, please read through the manuals of each optional
device before working on the product.
Operation sequence of wiring example
1. When the safety switch is pressed, Safety function
signals are delivered to P1-FS and the Safety function is
activated.
2. Even after the safety switch has been released, the safety
inputs to the P1-FS are held by the safety unit.
3. After the operator of the system has confirmed the
safety of human and the system, and then presses the
reset switch, S1-1 and S1-2 inputs to P1-FS are released
and Safety function is released.
6.3 Wiring example
The figure below is a wiring example under the following
conditions.
Use of an external power supply for safety signal
inputs
Reset/Release of safety signal inputs to P1-FS are
controlled using the reset function of a safety unit
6
Chapter 6 Installation
Summary of Contents for P1
Page 2: ...The picture is an example of installing P1 FS to SJ P1 ...
Page 8: ...C 3 Index Memo ...
Page 10: ...1 2 Chapter 1 Safety Precaution Risk Memo ...
Page 12: ...2 2 Chapter 2 Introduction to the Safety Function Guide Memo ...
Page 62: ...7 2 Chapter 7 Commissioning Memo ...
Page 64: ...8 2 Chapter 8 Verification and Validation Memo ...
Page 68: ...10 2 Chapter 10 Maintenance Memo ...
Page 72: ...11 4 Chapter 11 Specification and Technical data Memo ...