7-41
●
Long-term Shutdown
Circulation control
2011.07.07 12:45
Proc. status:
Function
:
Process prior to
long-term shutdown.
Proc. time: Approx. 6 minutes.
Operating guide
Place the ink reservoir tube
connection block in a beaker
charged with makeup ink. When
ready, press [Start/Continue].
Status:Service
Start/
Continue
Abort
Ink drainage
System-clean
Ink drainage
System-clean
5
Press the Start/Continue key.
¡
The following screen then opens and cleaning of the circulation system
starts.
Circulation control
2011.07.07 12:45
Proc. status: In progress.
Function
:
Process prior to
long-term shutdown.
Proc. time: Approx. 6 minutes.
Status:Service
Abort
Ink drainage
Ink drainage
System-clean
System-clean
Next, the following guidance appears.
3
Drain the ink ejected into the beaker, clean the beaker and then put
50ml of the makeup ink and a tube connection block into the beaker.
4
Beaker
Tube connection block
If ink is accidentally spilt, wipe
it up promptly with wiping
paper or something similar.
In addition, do not close the
maintenance cover until you
are sure that the wiped portion
has completely dried.
CAUTION