6.
Check that service value for voltage across SCB in phase L1, on the local HMI under
Main
menu /Test
is approximately 140%.
7.
Stop injection of all currents (that is, set all currents back to 0A).
8.
Check that all above mentioned function binary output signals now have logical value zero.
9.
Repeat above steps 1 - 8 for phase L2 and phase L3.
10.
Repeat above steps 1 - 8 to test different points from the above table.
Operation of this feature is based on internally calculated peak RMS voltage value. That means that
this feature is also able to operate for current signals with varying frequency. Note that for the
fundamental frequency injection, internally calculated voltage in percent corresponds directly to the
injected current value given in percent. However if it is required to test IDMT characteristic with a
varying frequency, the magnitude of the injected current must be adjusted accordingly. The following
formula can be used to calculate required current RMS value in percent at the desired injection
frequency in order to archive voltage percentage value given in the above table:
[ ]
[ ]
%
%
injected
rated
inj
f
I
U
f
=
×
EQUATION2274 V1 EN-US
(Equation 14)
Note that it is recommended to test IDMT operating times by injected current with the
rated frequency.
Above procedure can also be used to test definite time step. Pay attention that IDMT step can also
operate during such injection. Therefore make sure that appropriate settings are entered in order to
insure correct test results for definite time step.
11.4.16.2
Completing the test
GUID-5AB7880E-629C-45E5-AF91-3EBDF19DEA79 v2
Continue to test another functions or end the test by changing the Test mode setting to
Off
. Restore
connections and settings to their original values, if they were changed for testing purposes. Make
sure that all built-in features for this function, which shall be in operation, are enabled and with
correct settings.
11.4.17
Voltage-restrained time overcurrent protection VRPVOC
GUID-764DA61A-D987-4358-867A-DA43ADDC6E57 v5
Prepare the IED for verification of settings as outlined in section
11.4.17.1
Function revision history
GUID-9B72080E-B886-4138-B8BC-CCB99C289C87 v1
Document
revision
Product
revision
History
A
2.2.1
-
B
2.2.1
-
C
2.2.2
-
D
2.2.3
-
E
2.2.3
-
F
2.2.4
-
G
2.2.4
-
Table continues on next page
1MRK 511 403-UEN Rev. L
Section 11
Testing functionality by secondary injection
Bay control REC670
113
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Summary of Contents for REC670
Page 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 28: ...22 ...
Page 54: ...48 ...
Page 60: ...54 ...
Page 66: ...60 ...
Page 90: ...84 ...
Page 212: ...206 ...
Page 218: ...212 ...
Page 232: ...226 ...
Page 240: ...234 ...
Page 241: ...235 ...