To test
set
+
-
IEC04000202-3-en.vsd
IEC04000202 V3 EN-US
Figure 34:
Simulating the CB operation by a bi-stable relay/breaker simulator and manual
switches
11.10.2.1
Preparation of the verification
M12400-40 v8
1.
Check the function settings on the local HMI under
Main menu/Settings /IED Settings/
Control /Autorecloser79,5(0–>1)/SMBRREC:x(79,5(0–>)):x
If any timer settings are reduced to speed up or facilitate the testing, they shall be set to normal
after testing. A temporary label on the IED can be a reminder to restore normal settings after
which a verification test should be performed.
2.
Decide if a synchrocheck function SESRSYN shall be included in the test.
If SESRSYN as an internal function or external device is not operated by the injection, input
signal SYNC must be connected as a permanent high signal or controlled by a switch.
3.
Read and make notes of the reclosing operation counters on the local HMI under
Main menu /
Test/Function status /Control/AutoRecloser79,5(0–>1) /SMBRREC(79,5(0–>1)):x
Possibly reset the counters to
Zero
. Counters are reset in the reset menu.
4.
Make arrangements for the simulation of the CB, for example as in Figure
.
5.
Make arrangements for indication, recording and time measurements.
The signals for CBCLOSED, START, CLOSECB, READY and other relevant signals should
preferably be arranged for event recording with time tagging. If that is not possible, other
means of time measurement and recording should be arranged.
11.10.2.2
Switching the auto recloser to On and Off On and Off
M12400-79 v9
1.
Set the
Operation
setting to
Off
and check the state.
2.
Set the
Operation
setting to
On
and check the state, including
SETON
and
READY
.
The circuit breaker should be closed and ready.
3.
If external control inputs OFF/ON are used, check that they work. Set
ExternalCtrl
=
On
and
use the control inputs to switch On and Off, and check the state of the function.
Section 11
1MRK 511 403-UEN Rev. L
Testing functionality by secondary injection
166
Bay control REC670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Summary of Contents for REC670
Page 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 28: ...22 ...
Page 54: ...48 ...
Page 60: ...54 ...
Page 66: ...60 ...
Page 90: ...84 ...
Page 212: ...206 ...
Page 218: ...212 ...
Page 232: ...226 ...
Page 240: ...234 ...
Page 241: ...235 ...