active during first fault. No other outputs should be active. Functional outputs TRIP, all TRLn
and TR3P should be active during second fault.
7.
Initiate a phase-to-phase fault and switch it off immediately when the trip signal is issued for the
corresponding two phases. Initiate a second phase-to-phase fault between two other phases
within the time interval, shorter than
tEvolvingFault
(default setting 2.0s).
Check, that the output signals, issued for the first fault, correspond to a two-phase trip for
included phases. The output signals generated by the second fault must correspond to the
three-phase tripping action.
11.12.1.5
Circuit breaker lockout
SEMOD54375-170 v11
The following tests should be carried out when the built-in lockout function is used in addition to
possible other tests, which depends on the complete configuration of an IED.
1.
Check that
AutoLock
and
TripLockout
are both set to
Off
.
2.
Activate shortly the set lockout (SETLKOUT) signal in the IED.
3.
Check that the circuit breaker lockout (CLLKOUT) signal is set.
4.
Activate shortly thereafter, the reset lockout (RSTLKOUT) signal in the IED.
5.
Check that the circuit breaker lockout (CLLKOUT) signal is reset.
6.
Initiate a three-phase fault.
A three-phase trip should occur and all trip outputs TRL1, TRL2, TRL3 should be activated.
Functional outputs TRIP and TR3P should be active at each fault. The output CLLKOUT should
not be set.
7.
Activate the automatic lockout function, set
AutoLock
=
On
and repeat.
Besides the TRIP outputs, CLLKOUT should be set.
8.
Reset the lockout signal by activating the reset lockout (RSTLKOUT) signal.
9.
Activate the trip signal lockout function, set
TripLockout
=
On
and repeat.
All trip outputs (TRL1, TRL2, TRL3) and functional outputs TRIP and TR3P must be active and
stay active after each fault, CLLKOUT should be set.
10.
Reset the lockout.
All functional outputs should reset.
11.
Deactivate the trip signal lockout function, set
TripLockout
=
Off
and the automatic lockout
function, set
AutoLock
=
Off
.
11.12.1.6
Completing the test
SEMOD54375-203 v6
Continue to test another function or end the test by changing the
TESTMODE
setting to
Off
. Restore
connections and settings to the original values, if changed for testing purposes.
11.13
Monitoring
SEMOD53581-1 v1
11.13.1
Gas medium supervision SSIMG
GUID-0A83B4D5-51FF-43CB-8DC7-AFCEA2BC7B69 v5
Prepare the IED for verification of settings as outlined in Section
"Preparing the IED to verify settings"
in this chapter.
Values of logical signals for SSIMG protection are available on the local HMI under
Main menu /
Test /Function status /Monitoring /InsulationGas /SSIMG:x
, where x = 1, 2,....21.
The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI.
Check that the input logical signal
BLOCK
is logical zero and that on the local HMI, the logical signals
PRESALM
,
PRESLO
,
TEMPALM
,
TEMPLO
,
ALARM
and
LOCKOUT
are logical zero.
Using service kit. prepare the IED for verification of settings as outlined in Section
in this chapter.
1MRK 511 403-UEN Rev. L
Section 11
Testing functionality by secondary injection
Bay control REC670
189
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Summary of Contents for REC670
Page 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 28: ...22 ...
Page 54: ...48 ...
Page 60: ...54 ...
Page 66: ...60 ...
Page 90: ...84 ...
Page 212: ...206 ...
Page 218: ...212 ...
Page 232: ...226 ...
Page 240: ...234 ...
Page 241: ...235 ...