IEC07000188 V1 EN-US
Figure 35:
Test of RTC with I/O
11.17
Basic IED functions
SEMOD52026-1 v1
11.17.1
Parameter setting group handling SETGRPS
M11369-2 v4
Prepare the IED for verification of settings as outlined in section
in this chapter.
11.17.1.1
Verifying the settings
M11369-4 v5
1.
Check the configuration of binary inputs that control the selection of the active setting group.
2.
Browse to the
ActiveGroup
menu to achieve information about the active setting group.
The
ActiveGroup
menu is located on the local HMI under
Main menu/Test /Function status/
Setting groups /ActiveGroup
The
ActiveGroup
menu is located on the PCM600 under
Main menu/Test/Function status/
Setting groups /ActiveGroup
3.
Connect the appropriate dc voltage to the corresponding binary input of the IED and observe
the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4.
Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting groups are
described in the corresponding PCM600 documents and instructions for the operators within
the SCS are included in the SCS documentation.
11.17.1.2
Completing the test
M11369-39 v4
Continue to test another function or end the test by changing the
TESTMODE
setting to
Off
. Restore
connections and settings to the original values, if changed for testing purposes.
Section 11
1MRK 511 403-UEN Rev. L
Testing functionality by secondary injection
204
Bay control REC670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Summary of Contents for REC670
Page 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 28: ...22 ...
Page 54: ...48 ...
Page 60: ...54 ...
Page 66: ...60 ...
Page 90: ...84 ...
Page 212: ...206 ...
Page 218: ...212 ...
Page 232: ...226 ...
Page 240: ...234 ...
Page 241: ...235 ...