Section 1
Introduction
1.1
This manual
GUID-AB423A30-13C2-46AF-B7FE-A73BB425EB5F v20
The commissioning manual contains instructions on how to commission the IED. The manual can
also be used by system engineers and maintenance personnel for assistance during the testing
phase. The manual provides procedures for the checking of external circuitry and energizing the IED,
parameter setting and configuration as well as verifying settings by secondary injection. The manual
describes the process of testing an IED in a substation which is not in service. The chapters are
organized in the chronological order in which the IED should be commissioned. The relevant
procedures may be followed also during the service and maintenance activities.
1.2
Intended audience
GUID-C9B8127F-5748-4BEA-9E4F-CC762FE28A3A v11
This manual addresses the personnel responsible for commissioning, maintenance and taking the
IED in and out of normal service.
The commissioning personnel must have a basic knowledge of handling electronic equipment. The
commissioning and maintenance personnel must be well experienced in using protection equipment,
test equipment, protection functions and the configured functional logics in the IED.
1MRK 511 403-UEN Rev. L
Section 1
Introduction
Bay control REC670
11
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Summary of Contents for REC670
Page 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 28: ...22 ...
Page 54: ...48 ...
Page 60: ...54 ...
Page 66: ...60 ...
Page 90: ...84 ...
Page 212: ...206 ...
Page 218: ...212 ...
Page 232: ...226 ...
Page 240: ...234 ...
Page 241: ...235 ...