Maintenance is very important to improve the availability of the protection system by detecting
failures before the protection is required to operate. There is however little point in testing healthy
equipment and then putting it back into service with an open terminal, with a removed fuse or open
miniature circuit breaker with an open connection, wrong setting, and so on.
Thus a list should be prepared of all items disturbed during test so that all can be put back into
service quickly and without overlooking something. It should be put back into service item by item
and signed by the responsible engineer.
Section 13
1MRK 511 403-UEN Rev. L
Commissioning and maintenance of the fault clearing system
216
Bay control REC670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Summary of Contents for REC670
Page 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 28: ...22 ...
Page 54: ...48 ...
Page 60: ...54 ...
Page 66: ...60 ...
Page 90: ...84 ...
Page 212: ...206 ...
Page 218: ...212 ...
Page 232: ...226 ...
Page 240: ...234 ...
Page 241: ...235 ...