Section 3
Available functions
GUID-F5776DD1-BD04-4872-BB89-A0412B4B5CC3 v1
The following tables list all the functions available in the IED. Those functions that
are not exposed to the user or do not need to be configured are not described in this
manual.
3.1
Main protection functions
GUID-F871E970-5508-43FE-A2A8-68A4679BE52B v1
Table 2:
Example of quantities
2
= number of basic instances
0-3
= option quantities
3-A03
= optional function included in packages A03 (refer to ordering details)
C30
=1/2 CB application. For the pre-configured variants
IEC 61850 or
function name
ANSI
Function description
Bay control
REC670
(Customized)
REC670 (A30)
REC670 (B30)
REC670 (C30)
REC670 (D30)
Differential protection
HZPDIF
87
High impedance differential
protection, single phase
0-12
3-A02
3-A02
6-A07
3-A02
3.2
Back-up protection functions
GUID-06D023C0-3F72-4D89-A0A5-F4B452234B7B v1
IEC 61850 or
function name
ANSI
Function description
Bay control
REC670
(Customized)
REC670 (A30)
REC670 (B30)
REC670 (C30)
REC670 (D30)
Current protection
PHPIOC
50
Instantaneous phase
overcurrent protection
0-6
1-C51
2-C52
2-C53
1-C51
OC4PTOC
51_67
1)
Directional phase overcurrent
protection, four steps
0-6
1-C51
2-C52
2-C53
1-C51
EFPIOC
50N
Instantaneous residual
overcurrent protection
0-6
1-C51
2-C52
2-C53
1-C51
EF4PTOC
51N_67N
2)
Directional residual
overcurrent protection, four
steps
0-6
1-C51
2-C52
2-C53
1-C51
NS4PTOC
46I2
Directional negative phase
sequence overcurrent
protection, four steps
0-6
1-C51
2-C52
2-C53
1-C51
Table continues on next page
1MRK 511 403-UEN Rev. L
Section 3
Available functions
Bay control REC670
23
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Summary of Contents for REC670
Page 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 28: ...22 ...
Page 54: ...48 ...
Page 60: ...54 ...
Page 66: ...60 ...
Page 90: ...84 ...
Page 212: ...206 ...
Page 218: ...212 ...
Page 232: ...226 ...
Page 240: ...234 ...
Page 241: ...235 ...