Disturbance upload can be performed by the use of PCM600 or by any third party tool with IEC
61850 protocol. Reports can automatically be generated from PCM600. Disturbance files can be
analyzed by any tool reading Comtrade formatted disturbance files.
It could be useful to have a printer for hard copies. The correct start criteria and behavior of the
disturbance recording function can be checked when IED protective functions are tested.
When the IED is brought into normal service it is recommended to delete all recordings, made during
commissioning to avoid confusion in future fault analysis.
All recordings in the IED can be deleted in two ways:
1.
in the local HMI under
Main menu/Clear /Reset disturbances
, or
2.
in the Disturbance handling tool in PCM600 by selecting
Delete all recordings in the IED...
in the
window
Available Recordings in IED
.
11.1.4
Event recorder (ER) and Event list (EL)
M12645-2 v7
The result from the event recorder and event list can be viewed on the local HMI or, after upload, in
PCM600 as follows:
1.
on the local HMI under
Main menu/Events
, or in more details via
2.
the
Event Viewer
in PCM600.
The internal FIFO register of all events will appear when the event viewer is launched.
When the IED is brought into normal service it is recommended to delete all events resulting from
commissioning tests to avoid confusion in future fault analysis. All events in the IED can be cleared in
the local HMI under
Main Menu//Clear/Clear internal event list
or
Main menu /Clear/Clear
process event list
. It is not possible to clear the event lists from PCM600.
When testing binary inputs, the event list (EL) might be used instead. No uploading or analyzing of
registrations is then needed since the event list keeps running, independent of start of disturbance
registration.
11.2
Identifying the function to test in the technical
reference manual
M11748-2 v4
Use the technical manual to identify function blocks, logic diagrams, input and output signals, setting
parameters and technical data.
11.3
Differential protection
IP10805-1 v1
11.3.1
High impedance differential protection HZPDIF
SEMOD55257-42 v3
Prepare the IED for verification of settings as outlined in section
11.3.1.1
Verifying the settings
SEMOD55257-46 v5
1.
Connect a single-phase or three-phase test set to inject the operating voltage. The injection is
done across the measuring branch.
Section 11
1MRK 511 403-UEN Rev. L
Testing functionality by secondary injection
86
Bay control REC670
Commissioning manual
© 2017 - 2022 Hitachi Energy. All rights reserved
Summary of Contents for REC670
Page 1: ...Relion 670 SERIES Bay control REC670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 28: ...22 ...
Page 54: ...48 ...
Page 60: ...54 ...
Page 66: ...60 ...
Page 90: ...84 ...
Page 212: ...206 ...
Page 218: ...212 ...
Page 232: ...226 ...
Page 240: ...234 ...
Page 241: ...235 ...