17
RHUE-(3~6)A(V)HN
SMGB0066 rev.0 - 12/2009
Unit installation
Service Manual
1
1.1. rHUE-(3~6)A(V)Hn
1.1.1. Transportation
warning
Malfunction. Unit failure. Do not put any foreign material into the unit and make sure that none exists inside the
-
unit before the installation or test run.
• Hanging method
When hanging the unit, ensure its balance and lift it up smoothly and safely. Do not remove any packing materials until the
unit is positioned and hang the unit under packing condition with two ropes, as shown in the figure below.
Over 60º
0.7 to 1.0 m
Do not remove the
plastic band or the
corrugate paper frame
Pass the wire ropes
through each lifting hole
in the wooden base as
shown
Wire rope
warning
Crush hazard. Can cause seriour injury.
-
Lift the unit with 2 wire ropes and without removing its factory packaging. Make sure that the unit is lifted
-
smoothly and does not lean.
Do not attach lifting equipment to the plastic band or the corrugated paper frame, since the ropes might slip or
-
break the materials.
note
Make sure that the exterior of the unit is adequately protected with cloth or paper.
-
Do not hold the unit with the handles or the air outlet parts. Steel plates may be deformed. Use gloves.
-