8. Tools
8-2
8.2 Constructing the system
8.2.1 Constructing a new system
The following explains the procedure for creating a new project and setting up a new S10VE system.
(1) Start the S10VE
Set the switches on the CPU module according to the following table, and then turn on the power switch
on the power supply module of the S10VE.
Switch name
Setting
CPU RUN/STOP
RUN
LADDER RUN/STOP
STOP
ET ST.No.
0xFF
(2) Start BASE SYSTEM
Start BASE SYSTEM by following the procedure in
8.3.1.1 Starting BASE SYSTEM
.
(3) Create a project
From the BASE SYSTEM main menu, select
Project
and then
New
. The Properties window appears.
Create a new project by following the procedure in
8.4.2.1 Project menu: New
.
START
Start the S10VE
END
(1)
Start BASE SYSTEM
(2)
Create a new project
(3)
Change the connection-target PCs
(4)
Download CPMS
(5)
Set up the network
(6)
Set the time
(7)
Restart the S10VE
(8)
Install BASE SYSTEM
See
8.2.3 Installing the tools
Summary of Contents for S10VE
Page 1: ...User s Manual General Description SEE 1 001 A ...
Page 2: ...User s Manual General Description ...
Page 53: ...This page is intentionally left blank ...
Page 59: ...This page is intentionally left blank ...
Page 67: ...This page is intentionally left blank ...
Page 75: ...This page is intentionally left blank ...
Page 77: ...This page is intentionally left blank ...
Page 103: ...This page is intentionally left blank ...
Page 129: ...This page is intentionally left blank ...
Page 295: ...This page is intentionally left blank ...
Page 309: ...This page is intentionally left blank ...
Page 341: ...This page is intentionally left blank ...
Page 345: ...This page is intentionally left blank ...
Page 475: ...This page is intentionally left blank ...
Page 489: ...This page is intentionally left blank ...
Page 505: ......