14. Adding and Replacing Modules
14-26
14.9.2 Installing a PI/O module
(1) Confirm that the power switch on the power supply module is off.
(2) Mount the PI/O module to the mount base, and tighten the module fixing screws(M4) at the top and
bottom of the PI/O module(tightening torque: 1.0 N
·
m).
(3) If there are switches on the PI/O module, set them to the same state as on the module you replaced.
(4) Reconnect the cables you disconnected in step (9) in
14.9.1
to the terminal block or connectors.
(5) Turn on the facility-side power supply you turned off in step (7) in
14.9.1
.
(6) Turn on the power switch of the power supply module.
(7) Set the CPU RUN/STOP switch of the CPU module to RUN. Also set the LADDER RUN/STOP switch
to RUN.
(8) Confirm that the PI/O module is operating correctly.
14.9.3 Adding a PI/O module
(1) Make a note of the information displayed on the indicator of the CPU module, and whether each of its
LEDs(RUN, ALARM, STBY, ERR) is on, off, or blinking.
(2) Slide the LADDER RUN/STOP switch on the CPU module from RUN to STOP, and confirm that
LDRSTP
appears on the indicator.
(3) Use the RAS menu in BASE SYSTEM/S10VE to save the CP and HP error log information for the CPU
module. For details on how to save this information, see
8.4.6.2 RAS menu: Error Log Display
.
(4) Slide the CPU RUN/STOP switch on the CPU module from RUN to STOP, and confirm that
CPUSTP
appears on the indicator.
(5) Turn off the power switch of the power supply module.
(6) Mount the PI/O module to the mount base, and tighten the module fixing screws(M4) at the top and
bottom of the PI/O module(tightening torque: 1.0 N
·
m).
(7) Set any switches on the PI/O module. For details on how to set the switches, see
S10mini Hardware
Manual I/O Modules
(manual number SME-1-114).
(8) Turn on the power switch of the power supply module.
(9) Set the CPU RUN/STOP switch of the CPU module to RUN.
(10) Start BASE SYSTEM/S10VE, and set up the PI/O module you added. For details on how to set up a
new PI/O module, see the
S10VE Software Manual Operation Ladder Diagram System for Windows®
(manual number SEE-3-131). Note that no setup is required for PI/O modules whose model number
starts with LQX or LQY.
(11) Turn off the power switch of the power supply module.
(12) Connect the cables to the terminal block or connectors of the PI/O module.
(13) Turn on the power supply on the facility side connected to the PI/O module.
(14) Turn on the power switch of the power supply module.
(15) On the CPU module, set the CPU RUN/STOP switch and the LADDER RUN/STOP switch to RUN.
(16) Confirm that the PI/O module is operating normally.
(17) Back up the data on the PCs. For details on how to back up the data on the PCs, see
14.11.1 Backup
procedure
.
Summary of Contents for S10VE
Page 1: ...User s Manual General Description SEE 1 001 A ...
Page 2: ...User s Manual General Description ...
Page 53: ...This page is intentionally left blank ...
Page 59: ...This page is intentionally left blank ...
Page 67: ...This page is intentionally left blank ...
Page 75: ...This page is intentionally left blank ...
Page 77: ...This page is intentionally left blank ...
Page 103: ...This page is intentionally left blank ...
Page 129: ...This page is intentionally left blank ...
Page 295: ...This page is intentionally left blank ...
Page 309: ...This page is intentionally left blank ...
Page 341: ...This page is intentionally left blank ...
Page 345: ...This page is intentionally left blank ...
Page 475: ...This page is intentionally left blank ...
Page 489: ...This page is intentionally left blank ...
Page 505: ......