--- 10 ---
(4) Replacement of the Final Gear
[20] <20>
and the Ball Bearing 6201DDCMPS2L
[5] <5>
1. Remove the Gear Cover Ass'y
[8] <8>
from the Inner Cover
[12] <12>
then remove the Second Pinion and
Gear Set
[10] <10>
and the Washer
[11] <11>
.
2. Fix the Gear Cover Ass'y
[8] <8>
to the vise and remove the Bearing Cap
[3] <3>
with the J-21 Wrench or a
flat-blade screwdriver and a hammer. At this time, be careful that the Bearing Cap
[3] <3>
has a left-hand
thread.
3. As shown in Fig. 12, support the end surface of the Gear Cover Ass'y
[8] <8>
with an appropriate cylindrical jig
(with about 35 mm inside dia.). Push the end surface of Spindle (A)
[4] <4>
with a hand press to remove the
Final Gear
[20] <20>
.
4. Remove the Retaining Ring for D12 Shaft
[6] <6>
from Spindle (A)
[4] <4>
.
5. Remove the Ball Bearing 6201DDCMPS2L
[5] <5>
from Spindle (A)
[4] <4>
using the J-30 Bearing Puller
(Code No. 970804).
Fig. 12
Push
35 mm inside dia.
8-2. Wiring Diagram
Wiring diagram
Model SP 18VB
Connector 50092
[39]
Switch (A)
[40]
Cord
[47]
Noise suppressor
[43]
Terminal
[38]
Controller
[30]
Fig. 13
Connector 50092
[39]
Summary of Contents for SP 18SB
Page 27: ......