OPERATING THE MACHINE
5-36
1. Secure sling/chain tightly to the load being lifted. Wear
gloves when securing sling/chain.
2. Fasten sling/chain to bucket loop, with the bucket curled
and arm retracted.
3. Coordinate hand signals with your signal man before
starting.
4. Be aware of the location of all persons in the working
area.
5. Attach a hand line to load and make sure person holding
it is well away from load.
6. Before lifting, test your load.
• Park your machine close to load.
• Attach load to the machine.
• Raise load 50 mm above the ground.
• Swing the load all the way to one side.
• While keeping load close to the ground, move it away
from machine.
• If there is any indication of reduced stability of your ma-
chine, lower load to the ground.
7. Lift load only as high as necessary.
Summary of Contents for ZAXIS 120-3 class
Page 1: ......
Page 3: ......
Page 5: ......
Page 49: ...SAFETY SIGNS Europe Asia Middle and Near East Model Only S 38 MEMO ...
Page 131: ...BREAK IN 2 MEMO ...
Page 191: ...TRANSPORTING 6 MEMO ...
Page 290: ...HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT 8 HYDRAULIC CIRCUIT M1V1 08 001 ...
Page 292: ...8 ELECTRICAL DIAGRAM ...
Page 293: ...HYDRAULIC CIRCUIT AND ELECTRICAL CIRCUIT 8 MEMO ...
Page 295: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 MEMO ...
Page 351: ...SPECIFICATIONS 12 42 MEMO ...
Page 455: ...OPTIONAL ATTACHMENTS AND DEVICES 13 104 MEMO ...
Page 461: ...INDEX 14 MEMO ...