OPERATING THE MACHINE
5-11
Grading Operation
Use the blade for soil refilling and general grading operations
after excavation. Grading operation can be also performed by
operating the boom, arm, and bucket simultaneously.
IMPORTANT: Do not pull or push dirt with the bucket
when traveling. Excess force will be applied on each
part, and the machine may be damaged.
When grading by operating the boom, arm, and bucket
simultaneously:
1. When grading from the forward to the backward, slowly
roll in the arm while slightly raising the boom. As soon
as the arm passes the vertical position, slowly lower the
boom so that the bucket can be horizontally moved.
2. When grading from the backward to the forward,
operate the arm and bucket rolled back as described in
step 1.
Do the slope finishing work in the same procedure as
described in steps 1 and 2.
M1M7-05-012
Summary of Contents for Zaxis 17U-5A
Page 4: ......
Page 8: ...CONTENTS MEMO ...
Page 12: ...MACHINE NUMBERS 4 MEMO ...
Page 84: ...OPERATOR S STATION 1 18 MEMO ...
Page 86: ...BREAK IN 2 2 MEMO ...
Page 108: ...DRIVING THE MACHINE 4 14 MEMO ...
Page 228: ...MAINTENANCE 7 88 MEMO ...
Page 230: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Page 232: ...STORAGE 10 2 MEMO ...
Page 240: ...TROUBLESHOOTING 11 8 MEMO ...
Page 250: ...SPECIFICATIONS 12 10 MEMO ...
Page 270: ...13 20 NUMERIC KEYPAD LOCK OPTIONAL ATTACHMENT MEMO ...
Page 274: ...INDEX 14 4 MEMO ...
Page 276: ......
Page 277: ......
Page 278: ......