OPERATING ENGINE
3-13
2. Run the engine at slow idle speed for more than 5
minutes.
f
NOTE: At this time, do not operate the engine in slow or fast
speed.
3. Slowly raise the bucket 1 m off the ground.
4. Slowly extend the bucket cylinder to stroke end.
f
NOTE: Do not continuously operate the control lever for
more than 10 seconds at this time.
5. Slowly retract the bucket cylinder to stroke end.
f
NOTE: Do not continuously operate the control lever for
more than 10 seconds at this time.
6. Repeat steps 4 to 5 above until the loader front
operating speed becomes normal. When the
atmospheric temperature is lower than 0 °C (32 °F),
extend the warming up operation time by running the
engine at middle speed.
Summary of Contents for ZW 120-6
Page 4: ......
Page 10: ...MACHINE NUMBERS 2 MEMO ...
Page 58: ...SAFETY SIGNS S 48 MEMO ...
Page 156: ...BREAK IN 2 2 MEMO ...
Page 206: ...OPERATING MACHINE 5 20 MEMO ...
Page 218: ...TRANSPORTING 6 12 MEMO ...
Page 331: ...MAINTENANCE 7 113 25 Cutting edge mounting bolt Bolt dia in 1 Quantity 7 M4GB 07 116 ...
Page 344: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Page 348: ...STORAGE 10 4 MEMO ...
Page 354: ...TROUBLESHOOTING 11 6 MEMO ...
Page 356: ...SPECIFICATIONS 12 2 MEMO ...
Page 360: ...13 4 OPTIONAL ATTACHMENTS HYDRAULIC TYPE QUICK COUPLER OPERATION MEMO ...