OPERATING MACHINE
5-18
Precautions for After Operations
1. After finishing the day's operation, drive the machine to
a firm, level ground where no possibility of falling stones,
ground collapse, or floods are present.
(Park the machine referring to the "Parking" in the
"DRIVING THE MACHINE" chapter.)
2. Refill the fuel tank.
d
CAUTION: Wash the machine immediately after
operation and then coat rust-preventive oil to protect
the machine from rusting. If the machine continues to
be used with rust developing, oil leaks may occur.
IMPORTANT: If hard rain is expected or the machine is to
be stored, wrap the muffler with a tarpaulin to prevent
water from entering the muffler.
3. Clean the machine.
4. If anti-freeze or long life coolant is not used in cold
weather, be sure to drain coolant from the radiator and
the engine jacket.
Also, be sure to put a "No Water in Radiator" tag in a
visible place after the coolant has been drained.
Summary of Contents for ZW 120-6
Page 4: ......
Page 10: ...MACHINE NUMBERS 2 MEMO ...
Page 58: ...SAFETY SIGNS S 48 MEMO ...
Page 156: ...BREAK IN 2 2 MEMO ...
Page 206: ...OPERATING MACHINE 5 20 MEMO ...
Page 218: ...TRANSPORTING 6 12 MEMO ...
Page 331: ...MAINTENANCE 7 113 25 Cutting edge mounting bolt Bolt dia in 1 Quantity 7 M4GB 07 116 ...
Page 344: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Page 348: ...STORAGE 10 4 MEMO ...
Page 354: ...TROUBLESHOOTING 11 6 MEMO ...
Page 356: ...SPECIFICATIONS 12 2 MEMO ...
Page 360: ...13 4 OPTIONAL ATTACHMENTS HYDRAULIC TYPE QUICK COUPLER OPERATION MEMO ...