2-1
BREAK-IN
Break-in Operation for New Machine
IMPORTANT: If the machine is heavily loaded without
performing the break-in operation, damage to the
machine such as seizure and/or scoring may result and
the machine life will be significantly shortened. Be
sure to sufficiently perform break-in operation.
Machine life and performance will be greatly affected by the
extent of operation and maintenance of the machine during
the initial operation. Perform break-in operation for the first
100 hours.
Check the machine before starting the engine.
After starting the engine, sufficiently perform warm up
operation.
Avoid sudden starting, sudden acceleration and sudden
braking while traveling the machine.
Avoid heavy load for the front attachment.
Summary of Contents for ZW 310-6
Page 4: ......
Page 10: ...CONTENTS MEMO ...
Page 14: ...INTENDED USE 2 MEMO ...
Page 57: ...SAFETY SIGNS S 43 ZW310 6 SS 3777 2 ...
Page 59: ...SAFETY SIGNS S 45 ZW330 6 92Z7B S 40EU ...
Page 246: ...BREAK IN 2 2 MEMO ...
Page 280: ...DRIVING MACHINE 4 20 MEMO ...
Page 460: ...MAINTENANCE 7 146 MEMO ...
Page 464: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 4 MEMO ...
Page 468: ...STORAGE 10 4 MEMO ...
Page 474: ...TROUBLESHOOTING 11 6 MEMO ...
Page 498: ...INDEX 14 6 MEMO ...
Page 502: ...CONFORMITY MEMO ...
Page 506: ......