3-14
OPERATING THE ENGINE
2. Fully extend the bucket cylinder.
f
NOTE: Do not continuously operate the bucket control
lever for more than 10 seconds at a time. Do not bang
linkage when cold.
3. Slowly and fully retract the bucket cylinder.
f
NOTE: Do not continuously operate the bucket control
lever for more than 10 seconds at a time. Do not bang
linkage when cold.
4. Repeat steps 1 to 3 above until the loading linkage
speed is normal. When the air temperature is lower
than 0 °C (32 °F), extend the warm up time by running
the engine at about 1200~1500 min
-1
(RPM's).
f
NOTE: Headlights, working lights or room light may
become dim during engine preheating in the cold
environment.
Summary of Contents for ZW 370-6
Page 4: ...MEMO ...
Page 10: ...CONTENTS MEMO ...
Page 12: ...2 MACHINE NUMBERS Aftertreatment Device SCR TYPE MFG NO DOC TYPE MFG NO 95Z7B SCR4 95Z7B SCR4 ...
Page 53: ...SAFETY LABELS S 41 95Z7B S 40 ...
Page 148: ...1 84 OPERATOR S STATION MEMO ...
Page 218: ...OPERATOR S STATION 1 154 MEMO ...
Page 220: ...2 2 BREAK IN MEMO ...
Page 236: ...3 16 OPERATING THE ENGINE MEMO ...
Page 284: ...OPERATING THE MACHINE 5 28 MEMO ...
Page 426: ...MAINTENANCE 7 132 MEMO ...
Page 430: ...9 4 MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS MEMO ...
Page 434: ...10 4 STORAGE MEMO ...
Page 440: ...11 6 TROUBLESHOOTING MEMO ...
Page 442: ...12 2 SPECIFICATIONS MEMO ...
Page 450: ...14 8 INDEX MEMO ...