OPERATING THE ENGINE
3-14
2. Fully extend the bucket cylinder.
f
NOTE: Do not continuously operate the bucket control
lever for more than 10 seconds at a time. Do not bang
linkage when cold.
3. Slowly and fully retract the bucket cylinder.
f
NOTE: Do not continuously operate the bucket control
lever for more than 10 seconds at a time. Do not bang
linkage when cold.
4. Repeat steps 1 to 3 above until the loading linkage
speed is normal. When the air temperature is lower
than 0°C (32°F), extend the warm up time by running
the engine at about 1200~1500 min
-1
(RPM's).
f
NOTE: Headlights, working lights or room light may
become dim during engine preheating in the cold
environment.
Summary of Contents for ZW 550-6
Page 4: ......
Page 10: ...CONTENTS SPECIFICATIONS 12 1 Specifications 12 1 Intended Use 12 1 INDEX 14 1 ...
Page 12: ...MACHINE NUMBERS 2 Aftertreatment Device SCR TYPE MFG NO DOC TYPE MFG NO 95Z7B SCR4 95Z7B SCR4 ...
Page 54: ...SAFETY LABELS S 42 2 25 7 4 1 26 1 8 9 5 6 11 12 10 24 115Z7B S 42US ...
Page 148: ...OPERATOR S STATION 1 84 MEMO ...
Page 208: ...OPERATOR S STATION 1 144 MEMO ...
Page 210: ...BREAK IN 2 2 MEMO ...
Page 226: ...OPERATING THE ENGINE 3 16 MEMO ...
Page 274: ...OPERATING THE MACHINE 5 28 MEMO ...
Page 354: ...MAINTENANCE 7 70 MEMO ...
Page 418: ...9 4 MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS MEMO ...
Page 422: ...10 4 STORAGE MEMO ...
Page 428: ...11 6 TROUBLESHOOTING MEMO ...
Page 430: ...SPECIFICATIONS 12 2 MEMO ...
Page 438: ...INDEX 14 8 ZW550 6 US MEMO ...