11 (14)
5
Verify Operation
When the installation is completed, verify that the switch is in operation.
5.1
Power LED Indicator
Fig. 1
Power LED Indicator
LED
Status
Description
A
Power
Green On
DC-IN Power is On
Off
No Power in DC-IN
Anybus
®
Unmanaged Industrial L2 Switch Startup Guide
SP2555 1.1 en-US