Connections 

Find below information regarding the Intesis connections available. 
 

 

Power Supply 
Must  use  NEC  Class  2  or  Limited  Power  Source  (LPS) 
and SELV

 

rated power supply. 

 

If using DC power supply: 

Respect polarity applied of terminals (+) and (-). Be 
sure the voltage applied is within the range admitted 
(check  table  below).  The  power  supply  can  be 
connected  to  earth  but  only  through  the  negative 
terminal, never through the positive terminal. 

 

If using AC power supply: 

Make sure the voltage applied is the value admitted 
(24 Vac). Do not connect any of the terminals of the 
AC power supply to earth, and make sure the same 
power supply is not supplying any other device. 

 
 
Ethernet / Modbus TCP / Mitsubishi C. Controller 
Connect  the  cable  coming  from  the  IP  network  to  the 
connector  ETH  of  the  gateway.  Use  an  Ethernet  CAT5 
cable. If communicating through the LAN of the building, 
contact  the  network  administrator  and  make  sure  traffic 
on  the  port  used  is  allowed  through  all  the  LAN  path 
(check  the  gateway  user  manual  for  more  information). 
Default  IP  is  192.168.100.246.  DHCP  is  enabled  by 
default. 
 
 

Figure 3.1

 

Gateway’s connections

 

 
PortA  
Not used 
 
 
PortB / Modbus RTU
  
Connect the EIA485 bus to connectors B1 (-

), B2 (+) and B3 (SNGD) of gateway’s PortB. Respect the polarity.  

 
Remember the characteristics of the standard EIA485 bus: maximum distance of 1200 meters, maximum 32 devices 
connected to the bus, and in each end of the bus it must be a termination resistor of 120 Ω. The gateway has an 
internal bus biasing circuit that incorporates the termination resistor. If you install the gateway in one of the ends of 
the bus, then do not install an additional termination resistor in that end. 
 
 
Console Port
 
Connect  a  mini-type  B  USB  cable  from  your  computer  to  the  gateway  to  allow  communication  between  the 
Configuration Software and the gateway. Remember that Ethernet connection is also allowed. Check the user manual 
for more information. 
 
 
USB 
Connect a USB storage device (not a HDD) if required. Check the user manual for more information. 
 
 

Ensure proper space for all connectors when mounted (see section 66). 

 

Summary of Contents for Intesis INMBSMIT050C000

Page 1: ...bishi Electric Centralized Controller TCP IP XML Gateway for integration of Mitsubishi Elctric City Multi air conditioning system into Modbus RTU and TCP systems USER MANUAL Issue date 05 2019 r1 1 EN...

Page 2: ...urposes and are only intended to help improve understanding of the functionality and handling of the product In view of the wide range of possible applications of the product and because of the many v...

Page 3: ...ights reserved This information is subject to change without notice URL https www intesis com 3 25 Gateway for integration of Mitsubishi Electric City Multi air conditioning systems into Modbus RTU an...

Page 4: ...2 1 2 City Multi Group signals 9 3 Connections 12 Power device 13 Connect to Mitsubishi s Centralized Controller s 13 Connection to Modbus 13 3 1 1 Modbus TCP 13 3 1 2 Modbus RTU 13 Connect to PC Con...

Page 5: ...outdoor units installed In the Centralized Controller the control unit is the group each of which can have from 1 to 16 associated indoor units MNET s Centralized Controller is offered by Mitsubishi...

Page 6: ...n tool as well as Modbus TCP or RTU communication parameters From the configuration tool it is also possible to scan the Centrallized Controller for available groups and thereafter add them in the con...

Page 7: ...odbus RTU Both EIA485 and EIA232 physical layers are supported Only the lines RX TX and GND of the EIA232 connector are used TX and RX for EIA485 Baud rate can be selected between 1200 2400 4800 9600...

Page 8: ...ll the LOSSNAY groups 1 Set LC_Auto Mode cc x 30 11 W Operation Mode Heat Recovery all the LOSSNAY groups 1 Set Heat Recovery Mode cc x 30 12 W Operation Mode Bypass all the LOSSNAY groups 1 Set Bypas...

Page 9: ...onditioning indoor unit VRF M series P series and K control unit LC Lossnay FU Outdoor Air Processing unit BU Air to Water Booster unit WH Air to Water HEX unit CEh Heat Pump Modbus Address First Addr...

Page 10: ...c x 50 g x 100 15 x x x x x R W Allow set point control from the local panel 0 Allow 1 Not allow cc x 50 g x 100 16 x x x R W Allow filter reset control from the local panel 0 Allow 1 Not allow cc x 5...

Page 11: ...n parameter Setpoint Type is set to Multiple Setpoint 4 5 90 C cc x 50 g x 100 30 x x R W Setback upper temperature setpoint C Only available when configuration parameter Setpoint Type is set to Multi...

Page 12: ...ough the LAN of the building contact the network administrator and make sure traffic on the port used is allowed through all the LAN path check the gateway user manual for more information Default IP...

Page 13: ...l the LAN path Intesis Modbus Server Mitsubishi Centralized Controller comes with DHCP functionality enabled by default Connection to Modbus 3 1 1 Modbus TCP Same ethernet connection as for Mitsubishi...

Page 14: ...gateway Link to download the configuration tool USB Console cable to communicate with Intesis Product documentation Intesis MAPS Configuration monitoring tool for Intesis 4 1 1 Introduction Intesis MA...

Page 15: ...us Slave Modbus interface configuration and Mitsubishi Electric Centralized Controller s interface parameters Figure 4 2 Intesis MAPS configuration tab General and Modbus Slave tabs are explained in I...

Page 16: ...lized Controller Model Select the Centralized Controled model Possible values are AG 150A GB 50ADA or older EB 50GU AE 200 EW 50 or newer 5 Old Model Compatibility Set up if EB 50GU or AE 200 or newer...

Page 17: ...license in Centralized Controller is not active A progress bar will appear during the scan which will take a few seconds up to 1 or 2 minutes After scan is completed detected groups will be shown in t...

Page 18: ...AIC Indoor unit P Series SCAN only 3 LC Lossnay Both 4 FU Outdoor Air Processing unit Both 5 BU Air to Water Booster unit Both 6 WH Air to Water HEX unit Both 7 CEh Heat Pump Both 8 DC DiDo controlle...

Page 19: ...controller These are following Figure 4 8 Advanced Parameters for communication with Centralized Controllers For them the default values should be correct for most installations They might need adjust...

Page 20: ...on to save the project to the project folder on your hard disk more information in Intesis MAPS User Manual 2 You will be prompted to generate the configuration file to be sent to the gateway a If Yes...

Page 21: ...r to start using the diagnostic tools the connection with the Gateway must be stablished The Diagnostic section is composed by two main parts Tools and Viewers Tools Use the tools section to check the...

Page 22: ...1 EN HMS Industrial Networks S L U All rights reserved This information is subject to change without notice URL https www intesis com 22 25 More information about the Diagnostic section can be found...

Page 23: ...ply voltage applied WARNING In order to avoid earth loops that can damage Intesis and or any other equipment connected to it we strongly recommend The use of DC power supplies floating or with the neg...

Page 24: ...ax 127mA Recommended 24VDC Push Button Button A Check the user manual Button B Check the user manual Operation Temperature 0 C to 60 C Ethernet 1 x Ethernet 10 100 Mbps RJ45 2 x Ethernet LED port link...

Page 25: ...l rights reserved This information is subject to change without notice URL https www intesis com 25 25 6 Dimensions Recommended available space for its installation into a cabinet wall or DIN rail mou...

Reviews: