OM-228 187 Page 14
5-3. Installing Work Clamp
1
Nut
2
Work Cable From Unit
3
Work Clamp
4
Screw
5
Work Clamp Tabs
Bend tabs around work cable.
6
Insulating Sleeves
Slide one insulating sleeve over
work cable before connecting to
clamp.
Slide insulating sleeves over
handles.
802 456-A
.
Connection hardware must be tightened with proper tools. Do not just
hand tighten hardware. A loose electrical connection will cause poor
weld performance and excessive heating of the work clamp.
Tools Needed:
7/16 in.
7/16 in.
1
2
3
4
5
6