OM-198 683 Page 13
2-10. Installing Wire Spool and Adjusting Hub Tension
ST-072573-B
When a slight force is needed to turn spool, tension is set.
15/16 in
Use compression spring with
8 in (200 mm) spools.
Tools Needed:
2-11. Positioning Jumper Links
802 476-A
Check input voltage available at
site.
1
Jumper Links Access Door
Open door.
2
Jumper Link Label
Check label – only one is on unit.
3
Input Voltage Jumper Links
Move jumper links to match input
voltage.
Close and secure access door.
3
Tools Needed:
2
1
230 VOLTS
460 VOLTS
575 VOLTS
S-144 916-A
3/8 in
200 VOLTS
230 VOLTS
S-153 980
Summary of Contents for IronMan 275
Page 4: ......
Page 20: ...OM 198 683 Page 16 2 15 Weld Parameter ...
Page 21: ...OM 198 683 Page 17 196 843 VOL TAGE V V WIRE SPEED ...
Page 30: ...OM 198 683 Page 26 Notes ...
Page 31: ...OM 198 683 Page 27 SECTION 5 ELECTRICAL DIAGRAM 197 699 D Figure 5 1 Circuit Diagram ...
Page 41: ...Notes ...
Page 42: ...Notes ...