OM-2226 / Operation and Maintenance Manual
60CU20 / Series 500062 / 400 Hz. Generator Set
May 2, 2013
Chapter 3-2
Page 7
CAUTION
Remove all armature blocks, otherwise, damage to the armature could result.
6) Run-in and Periodic Check
a)
Mount the engine-generator assembly in a suitable test area and operate it for a 2-hour run-in.
b)
Shut down the engine after 2 hours and re-torque all coupling bolts to 85 foot-pounds (115 N-m) to
compensate for normal torque relaxation.
c)
Return the unit to normal service.
d)
After 200 hours of operation, check all coupling bolts with a torque wrench set at 85 foot-pounds (115
N-m).
e)
Return the unit to normal service.
f)
After each additional 2,000 hours of operation (or every year) recheck all coupling bolts to maintain
the same torque value.
Summary of Contents for 500062-DLX
Page 2: ......
Page 4: ......
Page 6: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ......
Page 231: ......
Page 232: ......
Page 233: ......
Page 234: ......
Page 235: ......
Page 236: ......
Page 237: ......
Page 238: ......
Page 239: ......
Page 240: ......
Page 241: ......
Page 242: ......