[17]
□
Step 4: L17A
– 9 turns (10 in/25.4cm) of #20 enameled wire on a T80-6 (yellow) toroid core. Wind the
inductor, scrape and tin the leads then insert to inductor into the PCB at the marked location, solder and trim
excess leads.
□
Step 5: L17B
– 8 turns (10 in/25.4cm) of #20 enameled wire on a T80-6 (yellow) toroid core. Wind the
inductor, scrape and tin the leads then insert to inductor into the PCB at the marked location, solder and trim
excess leads.