[18]
□
Step 6: L30A
– 11 turns (12 in/30.5cm) of #20 enameled wire on a T80-2 (red) toroid core. Wind the
inductor, scrape and tin the leads then insert to inductor into the PCB at the marked location, solder and trim
excess leads.
□
Step 7: L30B
– 9 turns (10 in/25.4cm) of #20 enameled wire on a T80-2 (red) toroid core. Wind the
inductor, scrape and tin the leads then insert to inductor into the PCB at the marked location, solder and trim
excess leads.