17
For end part
For middle part
Processing part
Drilling screw
4×10×8
(
Roof rafter set
)
18
70
Panel holder (end)
(
Length set
)
Panel holder (middle)
(
Length set
)
Gutter
Side frame
Gutter
Panel holder
(middle)
Panel holder
(end)
Roof rafter
■
Position of the panel holder
11
Installation of panel holder
Install the panel holders adjusting the U-shape gutter of gutter frame as a guide, and fix with drilling screw 4x10x8.
※
Insert the processing part of panel holder to the roof rafter (middle) and install it.