HODEDAH
®
www.Hodedah.com
Assembly Of Drawers
3
Screw M3.5 x 14mm
18 Pcs.
2
Screw M4 x 32mm
15 Pcs.
4
Handle
3 Pcs.
8
(1)
Nail
24 Pcs.
(2)
x3
1. Place panel
I
and
J
on each side of panel
G
with Panel
I
and
J
's PVC dowel insert to panel
G
's non-thru hole and Panel
G
's mini fix screws
insert into Panel
I
and
J
's thru holes as shown.
Then tighten mini fix on panel
I
and
J
clockwise to
lock mini fix up.
Next, tighten screw
②
to panel
I
and
J
's upper
thru holes to fix up to the panel
K
.
2. Flip drawer with bottom side
up, place panel
L
onto the
drawer and align properly. Then
nail the
nails provided with hammer on
the border of panel
L
as
shown.The gap between 2 nails
should be about 100mm.
After that, place a drawer slide B
⑬
with the small white roller
facing outward and with other
end tip touching panel
G
onto
each bottom side (angle) edge of
panel
I
and
J
. Then
tighten 3 screws
③
on each
drawer slide B
⑬
(as shown).
Place and fix Panel
M
onto Panel
G
by inserting the dowels onto
the non-thru holes at Panel
G
.
Then tighten screw
②
to panels
M
's thru holes to fix them onto
panels
K
and
L
.
3. Flip the drawer over.
4. Tighten 2 screw
④
from inner side of panel
G
into the handle
⑧
holes.
(3)
4
Screw M4 x 32mm
6 Pcs.