10
9
10
8A
8B
8C
C
11
11
B
STEP 4
Hodedah
www.hodedah.com
support @hodedah.com
B
8
CB SCREW M3.5 X 12MM
18
DRAWER SLIDE 16"
24
P/H SCREW M4 X 40MM
HANDLE IP994 (96MM) - PVC
3
6
6
M
CB SCREW M3.5 X 16MM
C
CB SCREW M4 X 35MM
K1
L2
K2
6
L2
L2
K2
K1
M
11
10
- Attach 2 x Panel (10) into Panel (8A). After that attach 1 x Panel (9) into both Panel (10) with
8 x CB Screw M4 x 35mm (C). Tighten using Phillips head screwdriver. Repeat for the next drawer.
- Fix 3 x Handle (K1) to Panel (8A), (8B) & (8C) front. Insert 6 x P/H Screw M4 x 40mm (K2) & tigthen with
Phillips head screwdriver.
- Slot 1 x Panel (11) into Panel (10) groove & insert 6 x CB Screw M3.5 x 16mm (M). Tighten with Phillips
head screwdriver. Do the same step for the next 2 drawer boxs.
- Fix 6 x Drawer slide 16" (L2) into Panel (10) using 18 x CB Screw M3.5 x 12mm (C) & tighten with
Philip head screwdriver.